Project Budget

$10M

Architect

Bence Mulcahy

Client/Developer

The Friends’ School

Year

2024

Photos courtesy of Bence Mulcahy, photography by Adam Gibson

Project Overview

Following the masterplan and after a new gymnasium was completed, Gandy and Roberts continued on with the redevelopment of their former gymnasium the WN Oats Centre, into a dedicated 2 story, teaching building. The redevelopment included new learning areas, offices and amenities in a central hub.

Structural, civil and hydraulic services provided to the design team.

Key Challenges

Reuse of the existing building structure, creating a new floor level and bringing the dated building into a new lease of life.

Maximising accessibility and connectivity, incorporating and connecting the new development to adjoining buildings, including a lift to the main carpark and a pedestrian bridge.

Result

Avoiding demolition and the repurpose of the old gymnasium, meant for a contained building site and less disruption to daily activities of the school.

Located at the centre of the school grounds, this building has created a central hub of connectivity with a modern, comfortable yet robust appeal.