Project Budget
$3.5M
Architect
Morrison and Breytenbach Architects
Client/Developer
Department of Education
Year
2011-2012
Project Brief
Structural, hydraulic and civil engineering services provided to the design team.
Key Challenges
Challenges included producing a design that delivered an economical outcome at the same time as meeting the Green Star requirements.
Result
This is a successfully delivered 6 star Green Star building recognised as State of the Art.