UTAS Inveresk Library 1

Project Budget

$25M

Architect

John Wardle Architects

Client/Developer

University of Tasmania

Year

2021

Photo courtesy of John Wardle Architects

Project Summary

The Library Building comprises of 3,300 sqm over 3 levels.

The super structure consists of post-tensioned concrete floors, reinforced concrete columns and precast walls.

The roof structure is an exposed mass timber construction.

Key Challenges

Ground conditions are such that the building is located in the Inveresk Flood Plain known for challenging foundation conditions.

The architect’s design intent for the structure was to be held true, while maintaining the functional clear open space.

Meeting project budget constraints and accommodating a practical use of timber in the structurer.

Result

An impressive architectural building, built on time and on budget that satisfies the client’s brief and requirements.